Sign Up

Have an account? Sign In Now

Sign In

Forgot Password?

Don't have account, Sign Up Here

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

Have an account? Sign In Now

You must login to ask a question.

Forgot Password?

Need An Account, Sign Up Here

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

Please briefly explain why you feel this user should be reported.

Sign InSign Up

Abstract Classes

Abstract Classes Logo Abstract Classes Logo
Search
Ask A Question

Mobile menu

Close
Ask a Question
  • Home
  • Polls
  • Add group
  • Buy Points
  • Questions
  • Pending questions
  • Notifications
    • The administrator approved your post.August 11, 2025 at 9:32 pm
    • Deleted user - voted up your question.September 24, 2024 at 2:47 pm
    • Abstract Classes has answered your question.September 20, 2024 at 2:13 pm
    • The administrator approved your question.September 20, 2024 at 2:11 pm
    • Deleted user - voted up your question.August 20, 2024 at 3:29 pm
    • Show all notifications.
  • Messages
  • User Questions
  • Asked Questions
  • Answers
  • Best Answers
Home/ Questions/Q 35846
Next
In Process
Himanshu Kulshreshtha
Himanshu KulshreshthaElite Author
Asked: March 29, 20242024-03-29T10:18:21+05:30 2024-03-29T10:18:21+05:30In: PGCIPWS

What are the various wastes of manufacturing and describe any two of them with suitable examples ?

Which are the different production wastes, and which two can you name with appropriate examples?

MWR-02
  • 0
  • 11
  • 33
  • 0
  • 0
Share
  • Facebook

    1 Answer

    • Voted
    • Oldest
    • Recent
    1. Himanshu Kulshreshtha Elite Author
      2024-03-29T10:18:57+05:30Added an answer on March 29, 2024 at 10:18 am

      In manufacturing, waste refers to any activity or process that does not add value to the final product or service. Identifying and eliminating waste is a fundamental principle of lean manufacturing, as it helps organizations improve efficiency, reduce costs, and enhance overall productivity. There are several types of waste in manufacturing, often referred to as the "7 Wastes" or "7 Mudas," which include:

      1. Transportation: Unnecessary movement of materials or products between processes or locations, leading to increased lead times, handling costs, and the risk of damage or loss.

      2. Inventory: Excess inventory beyond what is needed for immediate production or customer demand, tying up capital, occupying valuable space, and increasing the risk of obsolescence or waste.

      3. Motion: Unnecessary or excessive movement of people or equipment within the workspace, leading to inefficiency, fatigue, and potential safety hazards.

      4. Waiting: Idle time or delays in production caused by equipment breakdowns, material shortages, or inefficient scheduling, resulting in lost productivity and increased lead times.

      5. Overproduction: Producing more goods than required by current demand or customer orders, leading to excess inventory, storage costs, and the risk of obsolescence or markdowns.

      6. Overprocessing: Performing unnecessary or redundant processing steps that do not add value to the final product, leading to wasted time, labor, and resources.

      7. Defects: Quality issues, errors, or defects in the production process that result in rework, scrap, customer returns, or warranty claims, leading to increased costs and decreased customer satisfaction.

      Let's delve deeper into two types of waste with suitable examples:

      1. Transportation Waste:
        Example: Excessive Material Handling

        • In a manufacturing facility, raw materials are transported between different production processes using forklifts or conveyors.
        • If the layout of the facility is inefficient or if processes are not well-coordinated, excessive material handling may occur, leading to waste.
        • For instance, if materials are stored far away from the production line, workers may spend significant time transporting materials back and forth, increasing lead times and labor costs.
        • By optimizing the layout of the facility, implementing point-of-use storage, and streamlining material flow, organizations can reduce transportation waste and improve efficiency.
      2. Inventory Waste:
        Example: Excess Raw Material Inventory

        • A manufacturing company maintains a large inventory of raw materials to ensure uninterrupted production and mitigate the risk of stockouts.
        • However, if the company overestimates demand or fails to adjust inventory levels in line with actual production requirements, excess raw material inventory may accumulate.
        • This excess inventory ties up capital, occupies valuable storage space, and increases the risk of material obsolescence or deterioration.
        • By implementing demand-driven replenishment systems, such as Just-In-Time (JIT) or Kanban, and improving demand forecasting accuracy, organizations can minimize excess inventory waste and optimize inventory levels to meet customer demand efficiently.

      In conclusion, identifying and eliminating the various types of waste in manufacturing are crucial for achieving operational excellence and maximizing value for customers. By addressing transportation waste, inventory waste, and other forms of waste through continuous improvement initiatives, organizations can streamline processes, reduce costs, and enhance competitiveness in the market.

      • 0
      • Share
        Share
        • Share onFacebook
        • Share on Twitter
        • Share on LinkedIn
        • Share on WhatsApp

    Related Questions

    • Discuss the FIFO price method of costing of stock issued and valuation of stock in hand.
    • Discuss the merits and demerits of annual stock verifications.
    • Discuss the merits of proper stock accounting system.
    • Describe any four major reasons to do demand forecasting.
    • What do you mean by independent demand and dependent demand ? Give examples of each.
    • What are advantages and limitations of using this classification method ?
    • Discuss the ABC classification inventory using a suitable diagram.
    • Discuss the fixed quantity order model of inventory control system with a suitable diagram.

    Sidebar

    Ask A Question

    Stats

    • Questions 21k
    • Answers 21k
    • Popular
    • Tags
    • Pushkar Kumar

      Bachelor of Science (Honours) Anthropology (BSCANH) | IGNOU

      • 0 Comments
    • Pushkar Kumar

      Bachelor of Arts (BAM) | IGNOU

      • 0 Comments
    • Pushkar Kumar

      Bachelor of Science (BSCM) | IGNOU

      • 0 Comments
    • Pushkar Kumar

      Bachelor of Arts(Economics) (BAFEC) | IGNOU

      • 0 Comments
    • Pushkar Kumar

      Bachelor of Arts(English) (BAFEG) | IGNOU

      • 0 Comments
    Academic Writing Academic Writing Help BEGS-183 BEGS-183 Solved Assignment Critical Reading Critical Reading Techniques Family & Lineage Generational Conflict Historical Fiction Hybridity & Culture IGNOU Solved Assignments IGNOU Study Guides IGNOU Writing and Study Skills Loss & Displacement Magical Realism Narrative Experimentation Nationalism & Memory Partition Trauma Postcolonial Identity Research Methods Research Skills Study Skills Writing Skills

    Users

    Arindom Roy

    Arindom Roy

    • 102 Questions
    • 104 Answers
    Manish Kumar

    Manish Kumar

    • 49 Questions
    • 48 Answers
    Pushkar Kumar

    Pushkar Kumar

    • 57 Questions
    • 56 Answers
    Gaurav

    Gaurav

    • 535 Questions
    • 534 Answers
    Bhulu Aich

    Bhulu Aich

    • 2 Questions
    • 0 Answers
    Exclusive Author
    Ramakant Sharma

    Ramakant Sharma

    • 8k Questions
    • 7k Answers
    Ink Innovator
    Himanshu Kulshreshtha

    Himanshu Kulshreshtha

    • 10k Questions
    • 11k Answers
    Elite Author
    N.K. Sharma

    N.K. Sharma

    • 930 Questions
    • 2 Answers

    Explore

    • Home
    • Polls
    • Add group
    • Buy Points
    • Questions
    • Pending questions
    • Notifications
      • The administrator approved your post.August 11, 2025 at 9:32 pm
      • Deleted user - voted up your question.September 24, 2024 at 2:47 pm
      • Abstract Classes has answered your question.September 20, 2024 at 2:13 pm
      • The administrator approved your question.September 20, 2024 at 2:11 pm
      • Deleted user - voted up your question.August 20, 2024 at 3:29 pm
      • Show all notifications.
    • Messages
    • User Questions
    • Asked Questions
    • Answers
    • Best Answers

    Footer

    Abstract Classes

    Abstract Classes

    Abstract Classes is a dynamic educational platform designed to foster a community of inquiry and learning. As a dedicated social questions & answers engine, we aim to establish a thriving network where students can connect with experts and peers to exchange knowledge, solve problems, and enhance their understanding on a wide range of subjects.

    About Us

    • Meet Our Team
    • Contact Us
    • About Us

    Legal Terms

    • Privacy Policy
    • Community Guidelines
    • Terms of Service
    • FAQ (Frequently Asked Questions)

    © Abstract Classes. All rights reserved.